Turkey Bajra Seeds

Regular price Rs. 1,299.00
Sale price Rs. 1,299.00 Regular price Rs. 1,000.00
Unit price
Tax included.
62 people are viewing this right now
Turkey Bajra seeds | Villkart

Turkey Bajra Seeds

Product description
Product reviews
Shipping & Return

🌾 Introduction to Turkey Bajra

Turkey Bajra, a high-yielding and drought-resistant variety of pearl millet, is widely grown in arid and semi-arid regions. It is known for its robust growth, short maturity duration, and resilience to harsh climates, making it ideal for rain-fed as well as irrigated conditions. This guide provides step-by-step cultivation practices to help farmers maximize yield, manage risks, and achieve profitability.


Pre-Sowing Preparation

🗓 Optimal Sowing Time

  • Kharif (Rainy Season): Mid-June to Mid-July

  • Summer Crop (with irrigation): Mid-February to Mid-March

📍 Suitable Agro-Climatic Zones

  • Grows well in semi-arid to arid zones with annual rainfall between 300–600 mm.

  • Tolerates high temperatures (up to 45°C) and poor soils.

🌱 Soil Requirements

  • Type: Well-drained sandy loam to loamy soils.

  • pH: 6.0 to 8.5

  • Avoid waterlogged and saline soils.

🚜 Field Preparation

  1. Deep Ploughing (30 cm depth) in summer to expose pests and weeds.

  2. Follow with 2–3 cross harrowings to create a fine tilth.

  3. Level the field to avoid water stagnation.

  4. Incorporate 5–10 tons/acre of well-decomposed FYM (Farm Yard Manure) at least 2–3 weeks before sowing.


Seed Selection and Treatment

✔ Recommended Variety: Turkey Bajra

  • Short duration: 75–85 days

  • Suitable for rain-fed and irrigated conditions

  • Good grain and fodder yield

🌾 Seed Rate

  • 4–5 kg/acre (rainfed)

  • 2–3 kg/acre (irrigated)

💧 Seed Treatment

  • Fungicide: Treat seeds with Thiram or Carbendazim @ 2g/kg of seed.

  • Biofertilizers: Inoculate with Azospirillum and PSB for better nitrogen fixation and phosphorus uptake.

  • Dry treated seeds in shade for 30 minutes before sowing.


 Sowing Practices

🚜 Method of Sowing

  • Line sowing using seed drill or behind plough.

  • Row spacing: 45 cm

  • Plant spacing: 10–12 cm

  • Sowing depth: 2–3 cm

🌦 Irrigation Schedule (If Irrigated)

Stage Days After Sowing Irrigation Required
Germination 0–5 Days 1 irrigation
Tillering 15–20 Days 1 irrigation
Booting/Pre-flowering 35–40 Days 1 irrigation
Grain filling 50–55 Days 1 irrigation

Note: In rain-fed conditions, ensure sowing is done immediately after the first effective rainfall (minimum 50 mm).


  •  


 Weed Management

🌿 Critical Period

  • 15 to 35 days after sowing

🧴 Weed Control Options

  1. Pre-emergence Herbicide: Atrazine @ 400 g/acre in 200 liters water within 1 day of sowing.

  2. Manual Weeding: 2 hand weedings at 20 and 35 DAS if herbicide not used.


 Pest and Disease Management

🐛 Common Pests

Pest Symptoms Control Measures
Shoot fly Deadheart in seedlings Spray Dimethoate 30 EC @ 400 ml/acre
Stem borer Bore holes in stems Apply Carbofuran 3G @ 7 kg/acre in the whorl

🌱 Common Diseases

Disease Symptoms Control Measures
Downy Mildew White growth on leaves Spray Metalaxyl + Mancozeb @ 2 g/liter
Ergot Sticky pink fluid from earheads Spray Zineb @ 2 g/liter before flowering
Smut Black powdery grains Use disease-free seed; burn infected panicles



Harvesting and Post-Harvest Management

⛏ When to Harvest

  • Harvest when grains harden and turn yellowish-grey.

  • Test grain moisture content (~15%).

  • Avoid delays to prevent shattering losses.

🌾 Harvesting Method

  • Cut the earheads manually or mechanically.

  • Dry in sun for 3–5 days.

  • Thresh using mechanical thresher or traditional beating method.

📦 Storage

  • Ensure moisture is reduced to <12%.

  • Store in airtight containers or bags in dry, ventilated godowns.


🔁 Risk Management and Best Practices

  • Use certified seeds from reputed sources.

  • Time sowing with monsoon onset for rainfed areas.

  • Rotate crops with legumes to maintain soil fertility.

  • Monitor field regularly for pest/disease early detection.

  • Avoid over-irrigation—Bajra is drought-tolerant, not water-loving.


🧠 Final Farmer Tips

  • Maintain low plant population for better earhead development.

  • Use light irrigation at grain filling stage for enhanced yield.

  • Plan marketing ahead—collective selling via FPOs can ensure better prices.

  • Consider crop insurance schemes like PMFBY for risk protection.

Customer Reviews

Be the first to write a review
0%
(0)
0%
(0)
0%
(0)
0%
(0)
0%
(0)

At FutureFarming, we provide free shipping on orders above a minimum pricing limit, which is subject to change based on the company's convenience. However, we may charge for shipping in some cases based on the product weight, shipping location, and other relevant factors.

Shipping Times:

We usually process orders within 1-2 business days, and shipping times vary based on the courier partner. In general, it takes 3-7 days for the order to reach the customer, depending on the delivery location.

International Shipping:

At this time, we do not offer international shipping.

Order Tracking:

Once an order is placed, you will receive an automated email and SMS containing the order details and shipping status. You can also track your order using the tracking number provided in the email.

Delivery Exceptions:

In rare cases, the delivery may be delayed due to unforeseen circumstances, such as extreme weather conditions, natural calamities, or other factors beyond our control. We will make every effort to keep you informed of any such delays.

Returns and Exchanges:

Please refer to our Return and Refund Policy for information on returns and exchanges.

Link: https://harvest.futurefarming.co.in/policies/refund-policy

Recently Viewed Products